Part 4 · The Maths II: Acquisition Functions
Improvement, and its expectation
Define the improvement a new evaluation at x would deliver: I(x) = max( f(x) − f*n, 0 ). Under the posterior, f(x) is Gaussian, so I(x) is a censored Gaussian — and its expectation has a closed form:
μn, σn the posterior mean and standard deviation at x · f*n the best value seen so far · z = (μn − f*n)/σn the standardized improvement · Φ, φ the standard normal CDF and density
with Φ and φ the standard normal CDF and PDF. The two terms are exploitation and exploration wearing mathematical clothes: the first pays for a mean above the incumbent (weighted by the probability the improvement is real), the second pays for spread — a chance of a large upside even when the mean is unpromising. At z = 0 (mean exactly at the incumbent), EI = σ·φ(0) ≈ 0.40σ: pure uncertainty value.
Values below f* contribute zero improvement, so the integral starts at f*.
The lower limit v = f* maps to u = (f* − μ)/σ = −z, and (v − f*) = σ(u + z).
The Gaussian PDF is its own (negated) antiderivative under multiplication by u, and it is symmetric.
Tail probability plus symmetry of Φ.
At z = 0: EI = σφ(0) = σ/√(2π) ≈ 0.399σ — a point whose mean merely ties the incumbent is still worth two-fifths of its standard deviation. Uncertainty alone has cash value.